• 500ml Carbonated Drink Production Line PLC Control 3000bph
  • 500ml Carbonated Drink Production Line PLC Control 3000bph
  • 500ml Carbonated Drink Production Line PLC Control 3000bph
  • 500ml Carbonated Drink Production Line PLC Control 3000bph
  • 500ml Carbonated Drink Production Line PLC Control 3000bph
500ml Carbonated Drink Production Line PLC Control 3000bph

500ml Carbonated Drink Production Line PLC Control 3000bph

Product Details:

Place of Origin: China,Jiangsu
Model Number: DCGF14-12-5

Payment & Shipping Terms:

Minimum Order Quantity: 1set
Price: 19500dollers/set
Packaging Details: wood case
Delivery Time: 30 working days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10 sets per month
Get Best Price Contact Now

Detail Information

Brand Name: Bievo Certification: CE, ISO 9001:2008
Type: Filling Machine Name: Carbonated Drink Filling Line
Capacity: 3000BPH Bottle Type: PET Plastic Bottle
Filling Material: Beer, Water, Soft Drink Bottle Size: 200-2000ML
Key Selling Points: Long Service Life Voltage: 380V/3 Phase
Automatic Grade: Automatic Size: 2360x1770x2700MM
Weight: 3000KG Operation: Touch Screen ,Plc
Function: Bottle Washing Filling Capping Marketing Type: New Product 2020
Condition: New Filling Type: Under Pressure Filling
Workshop Layout: Free Design Driven Type: Electric
High Light:

3000bph Carbonated Drink Production Line

,

500ml Carbonated Drink Production Line

,

PLC Control Carbonated Drink Filling Machine

Product Description

3000bph 14125 500ml Famous Brand Carbonated Drink Production Line

 

3000BPH Carbonated Drink Water Bottling Plant Beverage Soft Drink Filling Production Line

 

Product Description:
Carbonated Cola Drink Filling Machine
Carbonated drink filling machine are manufactured by advanced technology, and we have completely equipment, so they enjoy fast sales. The filling line combines rinsing bottles, filling bottles and capping bottles together with PLC control. It is mainly used for plastic bottles with carbonated beverages and non-carbonated beverages.
Characteristic of carbonates drink filling machine
1. All parts contacting with beverages adopt top grade stainless steels whose surfaces are polished till smooth for easy rinsing. The sealing materials are EPDM rubber.
2. Carbonated beverage filling line/carbonated drink machine/carbonated filling machine/carbonated beverage machinery/carbonated filling line
3. Adopt PLC as center control, make use of pressure transmitter and electromagnetism pneumatic valve to measure liquid level,keep balance of filling pressure to insure stable liquid level.

Technical Parameters:

Techinical parameter
Model
DCGF14125
DCGF16165
DCGF24248
Bottle specifications(mm)
Φ=50-100 H=160-340
Capacity(350ml/bottle/hour)
3000BPH
5000BPH
8000BPH
Filling temperature
0-5
Filling type
Press filling type
Motor power(kw)
2.42
3.12
3.92
Overall dimension(L*W*H)mm
2360x1770x2700
2760x2060x2700
2800x2230x2700
Weight(Kg)
2800
3650
4800

Machines Details :

3 IN 1 Carbonated Soft Drinks Filling Machine 

500ml Carbonated Drink Production Line PLC Control 3000bph 0

500ml Carbonated Drink Production Line PLC Control 3000bph 1

500ml Carbonated Drink Production Line PLC Control 3000bph 2

 

500ml Carbonated Drink Production Line PLC Control 3000bph 3Out Look:

> 304 stainless steel frame
> Tempering Glass window, Clear & no odor
> Excellent start wheel design, easy change over parts
> Machine Base with anti-rust process, ensure the forever antirust
> All seal where liquid may Leakage & base neck come with rubber, water proof
> Manual lubrication system

Washing Part:

500ml Carbonated Drink Production Line PLC Control 3000bph 4

1) Into bottle way is flat conveyor cooperated with bottle feeding screw.
2) All 304/316 stainless steel rinse heads, water spray style inject design, more save water consumption and more clean .

3) 304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing
4) 304/316 stainless steel washing pump make the machine more durable .
Filling Part :
500ml Carbonated Drink Production Line PLC Control 3000bph 5
1)304/316 Stainless steel high precision filling nozzle
2) Filling volume adjustable in fine rank, same liquid level after filling
3)All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean
4) 304/316 stainless steel filling pump
Capping Part :
500ml Carbonated Drink Production Line PLC Control 3000bph 6

1) Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping
2) All 304/316 stainless steel construction
3) No bottle no capping
4) Automatic stop when lack of bottle
5) Capping effect is stable and reliable ,Defective rate ≤0.2% .

Electrical Brand List
AC Contactor
SIEMENS (GERMANY) 
Thermal overload relay
SIEMENS (GERMANY)
PLC
SIEMENS (GERMANY) 
Touch Screen
SIEMENS (GERMANY) 
Converter
SIEMENS (GERMANY) 
Power Switch
SIEMENS (GERMANY) 
Intermediate Relay
 

SCHNEIDER (FRANCE)

500ml Carbonated Drink Production Line PLC Control 3000bph 7

500ml Carbonated Drink Production Line PLC Control 3000bph 8

500ml Carbonated Drink Production Line PLC Control 3000bph 9

Zhangjiagang City Bievo Machinery Co., Ltd. is located in a national level development zone - Zhangjiagang Economic And Technology Development Zone, covering area more than 8,000 square meters.We enjoy convenient transportation with Shanghai Hongqiao International Airport and Shanghai Pudong International Airport on hand.Which accumulated a great number of China's top technologists in the liquid beverage industry.We have complete system from designing, manufacturing, installation, training to after service.Our main product water production line, carbonated beverage production line . Fruit juice and milk production line ,3 to 5 gallons production line, daily chemical production line and so on.Plat and tube UHT device, CIP system.All the products are sold well.We devote ourselves to the development, research and production of liquid food and beverage filling and packing industry .

500ml Carbonated Drink Production Line PLC Control 3000bph 10

500ml Carbonated Drink Production Line PLC Control 3000bph 11

Q1: What's your guarantee or the warranty of the quality if we buy your machines?

A1: We offer you high quality machines with 1 year guarantee . we will give u spare part free in 1 year,Life long after service. Mean while, our engineers go more than 50 countries for debugging, with rich experience.

Q2: When can I get my machine after I paid?

A2: We will deliver the machines on time as the date we agreed both side.

Q3: How can I install my machine when it arrives?

A3: We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.

Q4: What's the delivery time?

A4: 30-45 days after the T/T deposit or L/C.

Q5: What's min order quantity?

A5: 1 unit

500ml Carbonated Drink Production Line PLC Control 3000bph 12

1. Installation & debugging
After equipments reached the workshop of customer, place the equipments according to plane layout we offered. We will arrange seasoned technician for equipments installation, debugging and testing production at the same time to make the equipments reach the rated producing capacity of the line.

2. Training
Our company offers technology training to customer. The content of training is structure and maintenance of equipments, control and operation of equipments. Training is in the workshop of customer. Seasoned technician will guide and establish training outline.After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.

 

Want to Know more details about this product
I am interested in 500ml Carbonated Drink Production Line PLC Control 3000bph could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.