7000bph 3 In 1 200ml Carbonated Soft Drink Filling Machine
Product Details:
Place of Origin: | China,Jiangsu |
Brand Name: | BIEVO |
Certification: | CE |
Model Number: | DGZ32-32-8 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1set |
---|---|
Price: | 26000dollers/set |
Packaging Details: | wood case |
Delivery Time: | 30 working days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 10 sets per month |
Detail Information |
|||
Type: | Soft Drink Production Line | Name: | Gas Drink Production Line |
---|---|---|---|
Capacity: | 8000BPH | Bottle Type: | PET Bottle |
Filling Material: | Coke Type | Bottle Size: | 200-2000ML |
Key Selling Points: | High Precision | Voltage: | Standard |
Filling Range: | 200-2000ML | Automatic Grade: | Full Automatic |
Control: | SIEMENS Mittisubishi | Electric Parts: | Good Brand |
Function: | 3 In 1 | Marketing Type: | Easy To Operate |
Condition: | New | Filling Type: | Isobaric Filling |
Workshop Layout: | 200-500 Square Meters | Driven Type: | Electric And Pneumatic |
Brand Name: | Bievo | ||
High Light: | 200ml Carbonated Soft Drink Filling Machine,7000bph Carbonated Soft Drink Filling Machine,7000bph cold drink filling machine |
Product Description
7000BPH Carbonated drink bottling plant/ Filling Machine / soda energy soft drink filling machine
Products Introduction Of Carbonated Soft Drink Beverage Filling Botling Machine
High Hygiene Rinsing
304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during rinsing.
High precision valve
304/316 Stainless steel high precision filling nozzle.
Quick changeover for packages with different diameters.
Adjustable Capping Strength
Adjustable magnetic powered capping device ensures tightness and prevents damage of the cap.
Technical Parameters:
Model (BCGF)
|
18/18/6
|
24/24/6
|
32/32/8
|
40/40/12
|
Washing heads
|
18
|
24
|
32
|
40
|
Filling heads
|
18
|
24
|
32
|
40
|
Capping heads
|
6
|
6
|
8
|
12
|
Capacity (BPH)
|
3500
|
5000
|
8000
|
12000
|
Power(kw)
|
3.5
|
4.5
|
6
|
7.5
|
Dimension (mm)
|
2600*1920
|
3100*2300
|
3800*2500
|
4600*2800
|
*2550 | *2800 | *2900 | *2900 | |
Weight(kg)
|
3500
|
4500
|
5600
|
8500
|
Machines Details :
3 IN 1 Carbonated Soft Drinks Filling Machine
Washing Part:
<1> All 304/316stainless steel rinse heads, water spray style inject design, more save water consumption and more clean
<1> 304/316 Stainless steel high precision filling nozzle
<1> Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping <2> All 304/316 stainless steel construction <3> No bottle no capping <4> Automatic stop when lack of bottle
Beverage Mixer
Sprat tunnel
Electrical Brand List
|
|
AC Contactor
|
SIEMENS (GERMANY) |
Thermal overload relay
|
SIEMENS (GERMANY)
|
PLC
|
SIEMENS (GERMANY) |
Touch Screen
|
SIEMENS (GERMANY) |
Converter
|
SIEMENS (GERMANY) |
Power Switch
|
SIEMENS (GERMANY) |
Intermediate Relay
|
SCHNEIDER (FRANCE) |
Zhangjiagang City Bievo Machinery Co., Ltd. is located in a national level development zone - Zhangjiagang Economic And Technology Development Zone, covering area more than 8,000 square meters.We enjoy convenient transportation with Shanghai Hongqiao International Airport and Shanghai Pudong International Airport on hand.Which accumulated a great number of China's top technologists in the liquid beverage industry.We have complete system from designing, manufacturing, installation, training to after service.Our main product water production line, carbonated beverage production line . Fruit juice and milk production line ,3 to 5 gallons production line, daily chemical production line and so on.Plat and tube UHT device, CIP system.All the products are sold well.We devote ourselves to the development, research and production of liquid food and beverage filling and packing industry .
1.Installation, debug After equipment reached the workshop of customer, place the equipment according to plane layout we offered.We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line.Time for installation and debug is 15-25 days. 2.Training Our company offer technology training to customer.The content of training is structure and maintenance of equipment, control and operation of equipment.Training is in the workshop of customer.Seasoned technician will guide and establish training outline.After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures. 3.Quality guarantee We promise that our goods are all new and not used.They're made of suitable material, adopt new design.The quality, specification and function all meet the demand of contract.We promise that the products of this line could storage for one year without adding any aseptic. 4.After sales (1)After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price.In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures.If you could not solve the problems, we will guide you by phone;If the problems are still can not solve, we will arrange technician to your factory solving the problems.The cost of technician arrangement you could see the cost treatment method of technician. (2)After quality guarantee, we offer technology support and after sales service.Offer wearing parts and other spare parts at favorable price;After quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures.If you could not solve the problems, we will guide you by phone;If the problems are still can not solve, we will arrange technician to your factory solving the problems.The cost of technician arrangement you could see the cost treatment method of technician.
Q1:What's your guarantee or the warranty of the quality if we buy your machines?
A1:We offer you high quality machines with 1 year guarantee . we will give u spare part free in 1 year,Life long after service. Mean while, our engineers go more than 50 countries for debugging, with rich experience.
Q2:When can I get my machine after I paid?
A2:We will deliver the machines on time as the date we agreed both side.
Q3:How can I install my machine when it arrives?
A3:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.
Q4:What's the delivery time?
A4:30-45 days after the T/T deposit or L/C.
Q5:What's min order quantity?
A5:1 unit