3000bph 3 In 1 Isobaric Carbonated Soft Drink Filling Machine
Product Details:
Place of Origin: | China,Jiangsu |
Brand Name: | BIEVO |
Certification: | CE |
Model Number: | DGZ18-18-6 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1set |
---|---|
Price: | 26000dollers/set |
Packaging Details: | wood case |
Delivery Time: | 30 working days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 10 sets per month |
Detail Information |
|||
Type: | Glass Bottle Soda Water Filling Machine | Name: | Soda Water Filling Machinery |
---|---|---|---|
Capacity: | 3000BPH | Bottle Type: | Glass Bottle |
Filling Material: | Coke Type | Bottle Size: | 200-2000ML |
Key Selling Points: | High Precision | Voltage: | Standard |
Filling Range: | 200-2000ML | Automatic Grade: | Full Automatic |
Control: | SIEMENS Mittisubishi | Electric Parts: | Good Brand |
Function: | 3 In 1 | Marketing Type: | Easy To Operate |
Condition: | New | Filling Type: | Isobaric Filling |
Workshop Layout: | 200-500 Square Meters | Driven Type: | Electric And Pneumatic |
Brand Name: | Bievo | ||
High Light: | DGZ18-18-6 Carbonated Soft Drink Filling Machine,3000bph Carbonated Soft Drink Filling Machine,3000bph soda water filling machine |
Product Description
3000 bottles per hour Small soda water machine plant machinery glass bottle Carbonated drink filling machine
Products Introduction Of Carbonated Soft Drink Beverage Filling Botling Machine
High Hygiene Rinsing
304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during rinsing.
High precision valve
304/316 Stainless steel high precision filling nozzle.
Quick changeover for packages with different diameters.
Adjustable Capping Strength
Adjustable magnetic powered capping device ensures tightness and prevents damage of the cap.
Technical Parameters:
Model (BCGF)
|
18/18/6
|
24/24/6
|
32/32/8
|
40/40/12
|
Washing heads
|
18
|
24
|
32
|
40
|
Filling heads
|
18
|
24
|
32
|
40
|
Capping heads
|
6
|
6
|
8
|
12
|
Capacity (BPH)
|
3500
|
5000
|
8000
|
12000
|
Power(kw)
|
3.5
|
4.5
|
6
|
7.5
|
Dimension (mm)
|
2600*1920
|
3100*2300
|
3800*2500
|
4600*2800
|
*2550 | *2800 | *2900 | *2900 | |
Weight(kg)
|
3500
|
4500
|
5600
|
8500
|
Machines Details :
3 IN 1 Carbonated Soft Drinks Filling Machine
Beverage Mixer
Spray tunnel
Electrical Brand List
|
|
AC Contactor
|
SIEMENS (GERMANY)/Other high-end brand |
Thermal overload relay
|
SIEMENS (GERMANY)/Other high-end brand
|
PLC
|
SIEMENS (GERMANY) /Other high-end brand |
Touch Screen
|
SIEMENS (GERMANY) /Other high-end brand |
Converter
|
SIEMENS (GERMANY) /Other high-end brand |
Power Switch
|
SIEMENS (GERMANY) /Other high-end brand |
Intermediate Relay
|
SCHNEIDER (FRANCE)/Other high-end brand |
Zhangjiagang City Bievo Machinery Co., Ltd. is located in a national level development zone - Zhangjiagang Economic And Technology Development Zone, covering area more than 8,000 square meters.We enjoy convenient transportation with Shanghai Hongqiao International Airport and Shanghai Pudong International Airport on hand.Which accumulated a great number of China's top technologists in the liquid beverage industry.We have complete system from designing, manufacturing, installation, training to after service.Our main product water production line, carbonated beverage production line . Fruit juice and milk production line ,3 to 5 gallons production line, daily chemical production line and so on.Plat and tube UHT device, CIP system.All the products are sold well.We devote ourselves to the development, research and production of liquid food and beverage filling and packing industry .
We are proud to adhere to our company slogan "Engineering Excellence".Quality of products is the life of Beyond, customers’ satisfaction is our emphasis of work. Repeat orders from old customers are our standard to measure the user’s experience.
Warranty: 12 months
Warranty for motors: 12 months
In the warranty period:
In order to provide customers improve and thoughtful service, eliminating the customer's worries. Our company has established a perfect after-sales service system and effective after-sales service measures, and through a dedicated hotline after-sales service to provide users with satisfactory answers to questions and technical support; and has a service department to conduct regular customer visits. The company currently has more than 10 professional service engineers as a strong after-sales service team, ask your service to provide protection. Our company to you to make subordinate repair service commitment, and in accordance with the requirements of the service commitment to provide you with maintenance services.
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.